Why Timing Can Reverse an IRR Ranking
Two projects can have the same initial cost and even the same total future receipts, yet differ in when those receipts arrive. IRR summarizes each project with one rate, while NPV discounts its specific cash flows at a chosen required rate. Because these summaries respond differently to the timing pattern, the project with the higher IRR need not have the higher NPV at the required rate.
The distinction matters when comparing projects: an IRR ranking is not automatically an NPV ranking. The examples below show how to calculate both measures, interpret the difference, and check whether a conclusion depends on the required rate. Each example assumes annual cash flows at the stated year-ends.
Worked Example: Equal Total Receipts, Different Timing
Worked Example: Equal Total Receipts, Different Timing
Two hypothetical projects each require \$100 today. Project A pays \$100 at the end of year 1, \$600 at the end of year 2, and \$200 at the end of year 3. Project B pays \$900 at the end of year 2. Compare their IRRs and their NPVs at a required effective annual rate of 10%.
Method. Set each project's NPV to zero to find its IRR, then discount the original cash flows at 10% to compare NPVs. Both projects have total receipts of \$900, so their different timing patterns are central to this comparison.
Project B's IRR. Its equation of value at time 0 is
Thus \((1+j_B)^2=9\). Taking the positive rate root gives \(1+j_B=3\), so \(j_B=2\), or 200.00%.
Project A's IRR. Let \(x=1+j_A\). Its equation is
The positive solution is \(x\approx3.1249\), so \(j_A\approx2.1249\), or 212.49%. As a check, at \(x\approx3.1249\), the three receipts have present values of about \$32.00, \$61.44, and \$6.55. Their sum is about \$100.00, as required.
NPV at 10%. For Project A, the discount factors for years 1, 2, and 3 are \(1/1.1\), \(1/1.1^2\), and \(1/1.1^3\). Therefore
For Project B,
At the required rate, B's NPV exceeds A's by about \$6.76, even though A's IRR is higher. The comparison is checked directly from the discounted cash flows: the IRR ranking is A above B, but the NPV ranking at 10% is B above A. Money amounts are rounded to the nearest cent.
Common mistake avoided: Do not choose A at a 10% required rate just because its IRR is larger. The IRR describes the rate at which that project's own NPV is zero; it does not give the project's NPV relative to another project at 10%.
Why the Rankings Can Differ
The NPV comparison depends on the present values of the cash flows at the particular rate being used. In the first example, subtracting B's NPV from A's cancels the equal initial costs. If \(x=1+i\), the difference is
At 10%, this difference is negative: B has the larger NPV. But at B's IRR, \(x=3\), the difference is
Since B's NPV is zero at its own IRR, this shows that A's NPV is positive at B's IRR. That is consistent with A having the higher IRR.
The first example also isolates a useful point: equal total nominal receipts do not force equal NPVs, because a dollar received at one date and a dollar received at another date have different present values when \(i>0\). Nor is one project simply earlier throughout: A has a year-1 receipt, while B concentrates all its receipts in year 2. Comparing the complete schedules is more reliable than describing either project as merely “earlier.”
Worked Example: A Larger Delayed Receipt
Worked Example: A Larger Delayed Receipt
A hypothetical project Fast costs \$100 today and pays \$130 at the end of year 1. Project Delayed also costs \$100 today, but pays \$160 at the end of year 2. Find both IRRs and compare NPVs at a required effective annual rate of 10%.
Fast's IRR. The equation \(-100+130/(1+j_F)=0\) gives
Delayed's IRR. Its equation is \(-100+160/(1+j_D)^2=0\). Hence
Fast has the higher IRR. Now discount each receipt at 10%. Fast's NPV is
Delayed's NPV is
Thus Delayed has the greater NPV at 10%, despite its lower IRR. The larger receipt compensates for arriving one year later at this required rate. This example changes both receipt amount and timing; unlike the equal-total-receipts example, it does not isolate timing alone. Money amounts are rounded to the nearest cent.
Common mistake avoided: Do not infer from the word “delayed” that the project's NPV must be lower. Discount the stated amount at the stated date; a sufficiently larger later receipt can produce the greater NPV.
Worked Example: Multiple Receipts and a Different Ranking
Worked Example: Multiple Receipts and a Different Ranking
Project M costs \$100 today and pays \$50 at the end of year 1 and \$100 at the end of year 2. Project N costs \$100 today and pays \$160 at the end of year 2. Compare the IRRs and the NPVs at a required effective annual rate of 5%.
Project M's IRR. Put \(x=1+j_M\). Its equation of value is
The positive root is \(x=(1+\sqrt{17})/4\approx1.2808\). Thus \(j_M\approx0.2808\), or 28.08%. Checking at that root, the receipt present values total approximately \(50/1.2808+100/1.2808^2=\$100.00\).
Project N's IRR. Its equation gives \(100=160/(1+j_N)^2\), so
M therefore has the higher IRR. At 5%, however, M's NPV is
For N,
At the specified required rate, N has the greater NPV. The calculations use the actual year-1 and year-2 dates, rather than treating both receipts as if they arrived at the same time. Money amounts are rounded to the nearest cent.
Common mistake avoided: Do not add the \$50 and \$100 receipts and discount the resulting \$150 as though it all arrived in year 2. The year-1 payment uses one year of discounting; the year-2 payment uses two.
A Reliable Comparison Process
For an exam problem that asks for both measures, keep the IRR calculation separate from the NPV comparison. The IRR equation uses the project cash flows and sets their NPV to zero. The NPV comparison uses the required rate given in the problem, whether or not that rate is close to either project's IRR.
Record the amount and date of every outflow and receipt. Do not combine receipts at different dates.
Set that project's NPV equal to zero and solve for its rate. Check that the resulting rate makes its discounted receipts equal its initial cost.
Discount every cash flow at the stated required rate, using its own time period, then compare the resulting NPVs.
For example: “A has the higher IRR; B has the higher NPV at 10%.” This avoids implying the measures give the same ordering.
A positive NPV means the discounted value of receipts exceeds the initial cost at the specified rate; it does not mean the project has the higher IRR than another project. Also distinguish a ranking question from a decision about whether to accept a project. The required rate and the relevant decision setting matter, and the NPV calculation should not be replaced by an IRR ranking.
Common Mistakes and Exam Traps
- Ranking by IRR when asked for NPV. Calculate NPV at the stated required rate; a higher IRR does not guarantee a higher NPV there.
- Using one discount period for all receipts. A year-1 payment is discounted once, a year-2 payment twice, and so on.
- Assuming the timing effect has one direction for every rate. The NPV comparison can depend on the required rate because the projects have different cash-flow patterns.
- Comparing total receipts instead of their present values. Equal nominal totals can have unequal NPVs, and a larger nominal total does not by itself settle the ranking.
- Mixing up a project's IRR and the required rate. Use the IRR to describe the rate at which that project's NPV is zero; use the required rate to evaluate NPV.
Check Your Understanding
For each problem, compare the requested measures using the stated annual cash-flow dates. Money answers are rounded to the nearest cent.
- Project A costs \$500 and pays \$650 at the end of year 1. Project B costs \$500 and pays \$800 at the end of year 2. Find both IRRs and compare NPVs at 8%. (Answer: A IRR = 30.00%; B IRR \(\approx26.49\%\); NPV\(_A=\$101.85\), NPV\(_B=\$185.87\), so B has the greater NPV.)
- For the equal-total-receipts projects in the first worked example, compare their NPVs at 50%. (Answer: NPV\(_A\approx\$292.59\), NPV\(_B\approx\$300.00\); B has the greater NPV.)
- Project P costs \$100 and pays \$300 at the end of year 1 and \$200 at the end of year 3. Project Q costs \$100 and pays \$500 at the end of year 2. Compare their NPVs at 10%. (Answer: NPV\(_P\approx\$322.99\), NPV\(_Q\approx\$313.22\); P has the greater NPV.)
- Project R costs \$100 and pays \$130 at the end of year 1. Project S costs \$100 and pays \$160 at the end of year 2. Find both IRRs and compare NPVs at 10%. (Answer: R IRR = 30.00%, S IRR \(\approx26.49\%\); NPV\(_R=\$18.18\), NPV\(_S=\$32.23\), so S has the greater NPV.)
- For the projects in the first worked example, evaluate Project A's NPV at Project B's IRR. What does the sign imply about their IRRs? (Answer: NPV\(_A(200\%)\approx\$7.41>0\); since B's NPV is zero there and both projects have unique IRRs, A's IRR is higher.)