Tutorials › CAS Exam 5 - Basic Ratemaking and Estimated Claim Liabilities › Define and Apply Tail Factors

CAS Exam 5 · Development Factors and Tail · Tutorial 649 of 989

Define and Apply Tail Factors

Define the tail factor at the terminal observed age and apply it correctly after the selected development factors that lead to that age.

Intermediate 11 min read

What You'll Learn

  • Define a tail factor as the multiplier for development beyond the last observed age.
  • Distinguish a tail adjustment from development through observed ages.
  • Combine age-to-age factors and a tail factor to project an observed cumulative loss to ultimate.
  • Calculate the amount of projected emergence attributable to the tail.
  • Avoid applying a tail factor at the wrong age or counting it twice.

Why a Tail Factor Is Needed

A loss development triangle contains observations only through its latest recorded development age. For example, a portfolio may have cumulative losses observed at 12, 24, 36, and 48 months, but some claims may still develop after 48 months. If the projection treats the 48-month amount as ultimate, it assumes that no further development occurs. A tail factor makes an explicit allowance for development beyond that last observed age.

The tail is applied after the selected development factors that bring an earlier observation to the last observed age. It does not replace those factors. The correct projection therefore depends on identifying both the age of the observed cumulative loss and the age at which the tail begins.

Definition: A tail factor is a multiplicative factor for expected development from the last observed development age to ultimate. If \(C_b\) is cumulative loss at the last observed age \(b\), and \(U\) is the corresponding estimated ultimate loss, then the tail factor is \(T_{b\to\mathrm{ult}}=U/C_b\). A tail factor summarizes development after age \(b\); it is not an age-to-age factor for a specified observed interval.

This definition presumes that the numerator and denominator are on the same basis: for example, both refer to the same loss measure, coverage, and valuation framework. The factor is selected for a particular terminal age and loss basis; it should not be moved to another age without adjusting the development calculation.

Combining Observed-Age Factors With the Tail

Let \(C_a\) denote cumulative loss observed at development age \(a\). Suppose selected age-to-age factors are available from age \(a\) through the last observed age \(b\). Write \(f_{j\to k}\) for the selected factor from age \(j\) to the next age \(k\). The product of the selected factors through age \(b\) projects \(C_a\) to that terminal age. The tail factor then projects from \(b\) to ultimate.

Projection rule: If the selected age-to-age factors are applicable to the loss measure being projected, and the selected tail applies at the last observed age \(b\), then $$ \widehat{U}_a = C_a \left(\prod_{j=a\text{ through }b\text{ intervals}} f_{j\to k}\right) T_{b\to\mathrm{ult}}. $$ The product includes every selected interval from the age of the observation through the interval ending at \(b\). The tail is applied once, after that product.

The rule assumes a multiplicative development model: each selected factor scales the cumulative loss from one age to the next, and the tail scales the result from the terminal observed age to ultimate. It also assumes that the selected factors and tail are appropriate for the same loss basis and that no separate adjustment—such as a change in valuation basis—needs to be made between them. If a factor already includes development beyond \(b\), applying a separate tail would count some development twice.

Why the Factors Multiply

The projection rule follows directly from the meaning of each factor. For a particular loss period, suppose the selected factors are intended to project cumulative loss from age \(a\) to age \(b\). Their product is the cumulative multiplier over those observed-age intervals. By definition, the tail is the ratio of ultimate loss to loss at \(b\). Substituting the projected amount at \(b\) into that ratio gives the full projection.

$$ \widehat{C}_b = C_a\prod_{j=a\text{ through }b\text{ intervals}} f_{j\to k}, \qquad T_{b\to\mathrm{ult}} = \frac{\widehat{U}_a}{\widehat{C}_b} $$
$$ \widehat{U}_a = \widehat{C}_b T_{b\to\mathrm{ult}} = C_a \left(\prod_{j=a\text{ through }b\text{ intervals}} f_{j\to k}\right) T_{b\to\mathrm{ult}}. $$

Thus, the tail is not an arbitrary extra percentage added to the observed cumulative loss. It is a multiplier applied to the amount projected at the tail’s starting age. If the tail factor is 1.06, it represents a 6% increase over the amount at that starting age; it does not mean adding 6% of the original amount at some earlier age unless that earlier amount is already the terminal-age estimate.

Worked Applications

Worked Example: Projecting From an Earlier Age Through the Tail

A hypothetical liability portfolio has cumulative incurred losses of $800,000 at 24 months. Selected incurred development factors are 1.30 from 24 to 36 months and 1.15 from 36 to 48 months. The selected tail factor from 48 months to ultimate is 1.06. Assume all factors apply to the same loss basis, and the 48-month age is the last observed age. Project ultimate losses and identify the projected amount attributable to the tail.

Method. First project the 24-month amount through the observed intervals to 48 months. Then apply the tail that begins at 48 months.

At 36 months, the projected cumulative loss is $$ \$800{,}000(1.30)=\$1{,}040{,}000. $$

At 48 months, it is $$ \$1{,}040{,}000(1.15)=\$1{,}196{,}000. $$

Applying the 48-month tail factor gives $$ \widehat{U} = \$1{,}196{,}000(1.06) = \$1{,}267{,}760. $$

The projected tail emergence is the ultimate estimate less the projected 48-month amount: $$ \$1{,}267{,}760-\$1{,}196{,}000=\$71{,}760. $$

Check. The full multiplier from 24 months to ultimate is \(1.30(1.15)(1.06)=1.5847\). Multiplying $800,000 by 1.5847 also gives $1,267,760. The common mistake avoided is applying the 1.06 tail directly to the 24-month amount and omitting development through 48 months.

Worked Example: Separating Development Before and After the Tail Age

A hypothetical property portfolio has $2,400,000 of cumulative paid losses at 36 months. Selected paid development factors are 1.12 from 36 to 48 months and 1.05 from 48 to 60 months. A tail factor of 1.04 applies from 60 months to ultimate. Assume 60 months is the last observed age and the factors are selected for this paid-loss basis. Calculate the ultimate estimate and separate projected emergence before the tail from emergence in the tail.

Method. Project the observed 36-month amount to 60 months using both age-to-age factors. Then apply the tail at 60 months.

At 48 months: $$ \$2{,}400{,}000(1.12)=\$2{,}688{,}000. $$

At 60 months: $$ \$2{,}688{,}000(1.05)=\$2{,}822{,}400. $$

The projected 60-month-to-ultimate amount is $$ \$2{,}822{,}400(1.04)=\$2{,}935{,}296. $$

Emergence from 36 to 60 months is $$ \$2{,}822{,}400-\$2{,}400{,}000=\$422{,}400. $$ The tail emergence is $$ \$2{,}935{,}296-\$2{,}822{,}400=\$112{,}896. $$ The total projected increase after the observed 36-month amount is therefore $$ \$422{,}400+\$112{,}896=\$535{,}296, $$ which agrees with \(\$2{,}935{,}296-\$2{,}400{,}000\).

Check. The direct multiplier is \(1.12(1.05)(1.04)=1.22304\), and \(\$2{,}400{,}000(1.22304)=\$2{,}935{,}296\). The common mistake avoided is treating the 48-to-60 factor as part of the tail: the tail begins at 60 months, so the 48-to-60 interval must be applied before it.

Worked Example: Applying One Tail to Loss Periods at Different Ages

For a hypothetical group of claims, the selected tail factor from 48 months to ultimate is 1.05. Loss period A has $900,000 of cumulative incurred loss at 24 months, with selected factors of 1.15 from 24 to 36 months and 1.08 from 36 to 48 months. Loss period B has $1,050,000 observed at 48 months. Assume both periods use the same loss basis and the same tail applies at 48 months. Calculate each ultimate estimate, their total, and the total tail emergence.

Method. Project each period to the 48-month tail starting age first. For period A, use both intervening age-to-age factors; period B is already at 48 months.

For period A, the projected 36-month amount is $$ \$900{,}000(1.15)=\$1{,}035{,}000, $$ and the projected 48-month amount is $$ \$1{,}035{,}000(1.08)=\$1{,}117{,}800. $$ Its ultimate estimate is $$ \$1{,}117{,}800(1.05)=\$1{,}173{,}690. $$ Tail emergence for period A is \(\$1{,}117{,}800(0.05)=\$55{,}890\).

Period B is already at the tail starting age, so its ultimate estimate is $$ \$1{,}050{,}000(1.05)=\$1{,}102{,}500. $$ Its tail emergence is \(\$1{,}050{,}000(0.05)=\$52{,}500\).

The total ultimate estimate is $$ \$1{,}173{,}690+\$1{,}102{,}500=\$2{,}276{,}190. $$ The combined amount projected at 48 months is \(\$1{,}117{,}800+\$1{,}050{,}000=\$2{,}167{,}800\). Applying the common tail adds $$ \$2{,}167{,}800(0.05)=\$108{,}390, $$ which equals \(\$55{,}890+\$52{,}500\).

Check. The pre-tail total plus tail emergence is \(\$2{,}167{,}800+\$108{,}390=\$2{,}276{,}190\). The common mistake avoided is applying a 48-month tail to period A’s 24-month amount before projecting it to 48 months.

Common Errors and Practical Checks

A tail factor is meaningful only together with its starting age and loss basis. The numerical value alone is not enough to tell where it belongs in a projection. A factor of 1.04 selected from 60 months to ultimate should not be applied as though it covers the 48-to-60-month interval as well.

  • Omitting observed-age development: If an amount is observed at 24 months and the tail starts at 48 months, apply every selected factor from 24 through 48 before applying the tail.
  • Applying the tail at the wrong age: Match the tail to the age at which its numerator-to-denominator relationship is defined.
  • Counting development twice: Confirm that the age-to-age factors stop at the tail starting age. If a cumulative multiplier already reaches ultimate, a separate tail is not added again.
  • Confusing a factor with an additive percentage: A tail factor of 1.04 multiplies the amount at its starting age by 1.04; it does not add 1.04 times that amount.
  • Assuming every tail must exceed 1: A factor above 1 represents expected net upward development; 1 represents no net change. A factor below 1 can be appropriate when expected net development is downward, but it requires support from the selected assumptions.

A useful check is to write the full chain of ages before doing arithmetic: observed age, each selected interval, tail starting age, and ultimate. Then verify that every interval appears once and the tail appears once. If the terminal-age estimate is \(C_b\), the tail emergence should also reconcile as \(C_b(T_{b\to\mathrm{ult}}-1)\).

Accurate tail application matters because even a modest factor can affect projected ultimate losses across many loss periods. The method does not determine whether a particular tail factor is appropriate; it assumes the factor has been selected for the stated age and loss basis. With that selection in hand, applying it consistently is a direct multiplicative calculation, aligned with the CAS Exam 5 (Basic Ratemaking and Estimated Claim Liabilities) syllabus.

Check Your Understanding

For each problem, identify the age at which the tail begins before calculating.

  1. A hypothetical portfolio has $720,000 of cumulative losses at 36 months, a 36-to-48-month factor of 1.10, and a 48-month-to-ultimate tail factor of 1.05. What is the projected ultimate? (Answer: $831,600.)
  2. A hypothetical book has $1,250,000 of cumulative losses at 24 months. The selected factors are 1.16 from 24 to 36 months and 1.04 from 36 to 48 months; the tail from 48 months to ultimate is 1.03. Calculate the ultimate estimate. (Answer: $1,553,240.)
  3. A hypothetical portfolio has $3,600,000 at its last observed age of 60 months. The selected tail from 60 months to ultimate is 1.025. Calculate the projected tail emergence and ultimate. (Answer: Tail emergence = $90,000; ultimate = $3,690,000.)
  4. Two hypothetical loss periods share a 48-month-to-ultimate tail of 1.04. Period A has $500,000 at 24 months, with factors 1.20 from 24 to 36 months and 1.10 from 36 to 48 months. Period B has $800,000 at 48 months. Calculate the combined ultimate. (Answer: $1,518,400.)
  5. A hypothetical loss period has $2,000,000 at 24 months, factors of 1.15 from 24 to 36 months and 1.08 from 36 to 48 months, and a 48-month-to-ultimate tail of 1.04. Calculate its ultimate and the amount attributable to the tail. (Answer: Ultimate = $2,583,360; tail emergence = $99,360.)
Clinical Biostats