Tutorials › Introduction to Statistics › Right-Tail Probabilities and Complements

The Normal Distribution · Tutorial 456 of 996

Right-Tail Probabilities and Complements

Standardize a normal cutoff and use table areas and complements to find and interpret the probability of exceeding it.

Intermediate 9 min read

What You'll Learn

  • Express a right-tail probability as the complement of a left-tail probability.
  • Standardize a cutoff under a normal model.
  • Use a cumulative standard normal table for cutoffs on either side of the mean.
  • Use a mean-to-z table to find right-tail areas above and below the mean.
  • Explain why a cutoff exactly at the mean has a right-tail probability of one-half.
  • Check that a calculated right-tail probability is sensible for the cutoff’s position.

Why Right-Tail Probabilities Need Care

A question about a normal variable may ask for the probability of an observation being greater than a specified cutoff: for example, the probability that a hypothetical package weighs more than a target amount, or that a waiting time exceeds a stated number of minutes. This is a right-tail probability: it is the area under the normal density to the right of the cutoff.

The complement rule gives a direct way to calculate this area from a cumulative left-tail probability. The key is to apply it to the correct standardized cutoff. In particular, a cutoff below the mean has a negative z score, but the right-tail probability above it is large, not small. Keeping track of which side of the cutoff is requested prevents a common reversal.

Definition: For a random variable \(X\) and cutoff \(c\), the right-tail probability is \(P(X>c)\), the probability that \(X\) is greater than \(c\). If \(X\) has a continuous distribution, \(P(X=c)=0\), so \(P(X>c)=P(X\geq c)\).

The Complement Rule for a Normal Variable

Suppose a variable follows the normal model \(X\sim N(\mu,\sigma^2)\), where \(\mu\) is its mean and \(\sigma\) is its standard deviation. The model should be appropriate for the quantity being studied, and the values of \(\mu\) and \(\sigma\) should be specified. For a cutoff \(c\), standardize it using \(z=(c-\mu)/\sigma\). The resulting standard normal variable is \(Z=(X-\mu)/\sigma\), with \(Z\sim N(0,1)\).

Write \(\Phi(z)=P(Z\leq z)\) for the cumulative standard normal probability to the left of \(z\). Standardizing the event \(X>c\) gives \(Z>z\). Since the events \(Z\leq z\) and \(Z>z\) are disjoint and together cover all possible values of \(Z\), their probabilities sum to one.

$$ P(X>c)=P(Z>z)=1-P(Z\leq z)=1-\Phi(z), \qquad z=\frac{c-\mu}{\sigma}. $$

This is the same formula whether \(c\) is above or below the mean. What changes is the value of \(z\) and, consequently, the size of \(\Phi(z)\). A cutoff above the mean has \(z>0\), so its right tail is less than one-half. A cutoff below the mean has \(z<0\), so its right tail is greater than one-half. At the mean, \(z=0\), and symmetry gives a right-tail probability of one-half.

Result: For \(X\sim N(\mu,\sigma^2)\), first calculate \(z=(c-\mu)/\sigma\). Then \(P(X>c)=1-\Phi(z)\). This complement applies for positive, negative, and zero z scores.

Worked Examples

Worked Example: A Cutoff Above the Mean

Suppose, hypothetically, that the fill volume \(X\) of a certain type of container is modeled as \(X\sim N(500,12^2)\) milliliters. Under this stated normal model, find the probability that a container has a fill volume greater than 518 milliliters. The quantities are in the same units, and the problem specifies the normal model and its parameters, so standardization is appropriate.

First standardize the cutoff:

$$ z=\frac{c-\mu}{\sigma} =\frac{518-500}{12} =\frac{18}{12} =1.50. $$

A cumulative standard normal table gives \(\Phi(1.50)=P(Z\leq 1.50)\approx 0.9332\). The probability to the right is its complement:

$$ P(X>518)=1-\Phi(1.50) =1-0.9332 =0.0668. $$

Thus, under this hypothetical model, about 6.68% of containers have a fill volume greater than 518 milliliters. This is a relatively small probability, as expected: 518 milliliters is 1.50 standard deviations above the mean.

Worked Example: A Cutoff Below the Mean

Suppose, hypothetically, that the time \(X\) to complete a routine task is modeled as \(X\sim N(40,6^2)\) minutes. Find the probability that the task takes more than 34 minutes. Assume the normal model and parameters are suitable for these hypothetical completion times.

The cutoff is below the mean, so its z score is negative:

$$ z=\frac{34-40}{6} =\frac{-6}{6} =-1.00. $$

A cumulative table gives \(\Phi(-1.00)\approx 0.1587\). This is the probability of taking 34 minutes or less. The requested probability is the complement:

$$ P(X>34)=1-\Phi(-1.00) =1-0.1587 =0.8413. $$

Under the model, the probability of a completion time greater than 34 minutes is about 84.13%. The result is larger than one-half because 34 minutes is below the mean of 40 minutes: most of the distribution lies above this cutoff. Notice that using \(\Phi(-1.00)\) itself would answer the opposite question, the probability of a completion time at or below 34 minutes.

Using a Mean-to-Z Table

Some standard normal tables report the area between zero and a z score rather than the cumulative area to its left. Let \(A(a)=P(0<Z<a)\) for \(a\geq 0\). By symmetry of the standard normal distribution, a table entry for a positive value \(a\) also gives the area between \(-a\) and zero. The area on either side of zero is one-half.

These facts yield two different-looking calculations for a right-tail probability, depending on whether the cutoff is above or below the mean. If \(z>0\), the right tail is the half-area to the right of zero minus the area from zero to \(z\). If \(z<0\), the right tail consists of the half-area to the right of zero plus the area between \(z\) and zero.

$$ P(Z>z)= \begin{cases} 0.5-A(z), & z>0,\\ 0.5, & z=0,\\ 0.5+A(|z|), & z<0. \end{cases} $$

The absolute value in the negative-z case matters: a mean-to-z table is commonly arranged for nonnegative z scores, so look up the magnitude of the negative score. The plus sign is also essential. When the cutoff is below zero, adding the between-area to 0.5 gives the right tail; subtracting it would give the left tail.

Worked Example: Using a Mean-to-Z Table Above the Mean

Suppose, hypothetically, that the length \(X\) of a manufactured component is modeled as \(X\sim N(40,5^2)\) millimeters. Find the probability that its length exceeds 44.35 millimeters. The model, mean, and standard deviation are stipulated for this example.

Standardize the cutoff:

$$ z=\frac{44.35-40}{5} =\frac{4.35}{5} =0.87. $$

A mean-to-z table gives the area between zero and \(z=0.87\) as approximately \(A(0.87)=0.3078\). The right tail starts with the half-area to the right of zero and excludes the area from zero to the cutoff:

$$ P(X>44.35)=P(Z>0.87) =0.5-0.3078 =0.1922. $$

The modeled probability of a component longer than 44.35 millimeters is approximately 19.22%. Equivalently, the cumulative area to the left is \(0.5+0.3078=0.8078\), whose complement is \(1-0.8078=0.1922\). Both table methods give the same result.

Why the Complement Method Works

The complement rule is not a special property of the normal distribution. It follows from the basic structure of probability: an event and its complement are mutually exclusive and exhaustive. For a continuous normal variable, the event that \(X\) is at or below \(c\) is the complement of the event that \(X\) is above \(c\). Their probabilities therefore add to one.

In terms of the density, the cumulative area \(\Phi(z)\) includes all the area to the left of \(z\), while the right tail includes all the remaining area. The total area under the density is one, so the remaining area is \(1-\Phi(z)\). Because a continuous distribution assigns probability zero to a single point, it does not matter for these probabilities whether the cutoff itself is included in the left or right event.

1
Identify the event.
Translate “greater than \(c\)” into the right-tail probability \(P(X>c)\).
2
Standardize the cutoff.
For the stated model \(X\sim N(\mu,\sigma^2)\), calculate \(z=(c-\mu)/\sigma\).
3
Find the left-tail area.
Read \(\Phi(z)\) from a cumulative table, or use the appropriate half-area and mean-to-z table entry.
4
Take the complement and interpret.
Calculate \(1-\Phi(z)\), then state the probability in the original context and units.

Checks and Common Pitfalls

The sign and size of the answer offer useful checks. If \(c>\mu\), then \(z>0\) and the right-tail probability must be below 0.5. If \(c<\mu\), then \(z<0\) and the right-tail probability must be above 0.5. If \(c=\mu\), symmetry makes it exactly 0.5. These checks can reveal a mistaken sign or a subtraction in the wrong direction.

  • Using the left tail as the answer. For a request for values greater than \(c\), \(\Phi(z)\) is the area on the wrong side. Use \(1-\Phi(z)\).
  • Subtracting the mean-to-z area for a negative z score. For \(z<0\), the right tail is \(0.5+A(|z|)\), not \(0.5-A(|z|)\).
  • Confusing a density height with an area. A normal-table probability is an area over an interval or tail, not the density’s height at one point.
  • Forgetting the model and units. State the assumed normal model and standardize using the standard deviation in the same units as the cutoff and mean.

For instance, in the 34-minute example, a common mistake is to report \(0.1587\) as the probability of taking more than 34 minutes. That value is \(\Phi(-1.00)\), the probability of a time at or below 34 minutes. Since the question asks for a time above the cutoff, its complement is \(1-0.1587=0.8413\). The value exceeding one-half is also consistent with a cutoff below the mean.

Key takeaway: A right-tail probability is the complement of the cumulative left-tail probability: \(P(X>c)=1-\Phi((c-\mu)/\sigma)\). The formula does not change when the cutoff moves below the mean; only the sign of its z score and the resulting tail area change.

Check Your Understanding

Answer each question using the right-tail event and, where appropriate, the complement rule.

  1. If \(X\sim N(20,4^2)\), what z score corresponds to the cutoff \(c=26\), and which standard normal area must be complemented to find \(P(X>26)\)?
  2. A cutoff is two standard deviations below the mean. Should its right-tail probability be greater than or less than 0.5? Explain using the cutoff’s position.
  3. A mean-to-z table gives \(A(0.60)=0.2257\). Use it to find the right-tail probability for \(z=0.60\).
  4. Using the same table entry, find the right-tail probability for \(z=-0.60\). Explain why the operation differs from the positive-z case.
  5. Why do \(P(X>c)\) and \(P(X\geq c)\) have the same value for a continuous normal variable?