What Does It Mean to Verify a Proposed Delta?
A proposed value of \(\delta\) is useful only if it does what the epsilon-delta condition requires: every input sufficiently close to \(a\) must produce an output within the requested tolerance \(\varepsilon\) of the proposed limit \(L\). Verifying a delta means checking this implication using an estimate for the output error.
The strict inequalities matter. The input must be closer than \(\delta\), not exactly \(\delta\) away, and the output error must be strictly less than \(\varepsilon\). In the linear and quadratic examples here, the proposed limit is \(L=f(a)\). We will check whether a stated positive \(\delta\) guarantees the requested bound by substituting it into an estimate for \(|f(x)-f(a)|\).
Verifying a Delta for a Linear Function
Let \(f(x)=mx+b\), where \(m\) and \(b\) are constants. For any input \(x\) and point \(a\), subtracting the function values gives
Taking absolute values shows that the output error is the slope magnitude multiplied by the input distance. If \(m\ne 0\) and \(|x-a|<\delta\), then
Thus, a proposed \(\delta\) passes this test whenever \(|m|\delta\le\varepsilon\). Notice that equality is allowed in this last comparison: the output error is strictly less than \(|m|\delta\), so it is still strictly less than \(\varepsilon\) when \(|m|\delta=\varepsilon\).
Worked Example: Checking a Delta for a Linear Function
Consider \(f(x)=3x-2\) at \(a=1\), with proposed limit \(L=f(1)\), tolerance \(\varepsilon=0.12\), and proposed \(\delta=0.04\). First calculate the limit value:
For any \(x\), the output error is
If \(0<|x-1|<0.04\), then
The computed upper bound is exactly \(\varepsilon\), but the error is strictly less than that bound. Therefore this \(\delta\) guarantees \(|f(x)-1|<0.12\). Checking the proposed value in the criterion gives \(|m|\delta=3(0.04)=0.12=\varepsilon\), as required.
If \(m=0\), the function is constant: \(f(x)=b\). Then \(f(x)-f(a)=0\) for every \(x\), and \(0<\varepsilon\) for every positive tolerance. Every positive \(\delta\) therefore works. This case should be stated separately rather than using a strict estimate whose right-hand side is zero.
Turning a Quadratic Input Restriction into an Error Bound
Now let \(f(x)=Ax^2+Bx+D\), where \(A\), \(B\), and \(D\) are constants. The constant term cancels when we subtract \(f(a)\). Set \(h=x-a\), so \(x=a+h\). Factoring the difference gives
Write \(C=2Aa+B\). If \(|x-a|=|h|<\delta\), the triangle inequality gives the useful estimate
When \((A,B)\ne(0,0)\), the quantity \(|C|+|A|\delta\) is positive. Indeed, if \(A\ne0\), its second term is positive; if \(A=0\), then \(B\ne0\) and \(C=B\ne0\). For \(h\ne0\), the restrictions \(|h|<\delta\) and \(|h|<\delta\) in the two factors therefore imply the strict estimate
If \(h=0\), the output error is zero, so the requested strict epsilon bound holds directly. This also covers the excluded input \(x=a\), if one chooses to include it in the implication. If \(A=B=0\), the function is constant, and its output error is zero; handle that case directly instead of applying the displayed strict estimate with a zero right-hand side.
Worked Quadratic Verifications
Worked Example: A Quadratic Delta That Passes
Let \(f(x)=2x^2-3x+1\), \(a=1\), \(\varepsilon=0.3\), and proposed \(\delta=0.1\). The proposed limit is
Here \(A=2\) and \(B=-3\), so the coefficient at \(a=1\) is
Substitute the proposed delta into the estimate:
Since \(0.12\le0.3\), the estimate proves the requested bound. In detail, if \(0<|x-1|<0.1\), then
Thus the proposed \(\delta=0.1\) guarantees the output error is less than \(0.3\). Substitution into the test confirms the comparison \(0.12\le0.3\).
Worked Example: Equality in the Quadratic Test
Take \(f(x)=x^2\), \(a=0\), \(\varepsilon=\frac14\), and proposed \(\delta=\frac12\). The limit value is \(f(0)=0\). The coefficients are \(A=1\), \(B=0\), so \(2Aa+B=0\). Substitution gives
Although the calculated bound equals \(\varepsilon\), the output-error estimate is strict. Whenever \(0<|x|<\frac12\),
Therefore the proposed delta works. Substituting it back into the error expression verifies the conclusion: the error is strictly below \(\frac14\), not merely at most \(\frac14\).
Worked Example: A Constant Quadratic
Let \(f(x)=5\), written as \(Ax^2+Bx+D\) with \(A=0\), \(B=0\), and \(D=5\). At \(a=2\), the proposed limit is \(f(2)=5\). For any positive \(\varepsilon\) and any positive proposed \(\delta\),
So, for example, \(\varepsilon=0.01\) and \(\delta=3\) satisfy the required implication for every \(x\). This check is direct. The nonconstant-quadratic estimate does not apply here: its right-hand side would be \(3(0+0)=0\), and one must not claim \(0<0\).
Why the Estimate Works
The method is an instance of a simple proof pattern: begin with the output error, rewrite it so the input distance appears as a factor, and then use the assumed input restriction to bound the factors. For a quadratic, the factorization shows exactly where the dependence on \(x-a\) occurs. The triangle inequality controls the other factor without needing to know the particular input \(x\).
Subtract \(f(a)\) from \(f(x)\) and take the absolute value.
For the quadratic, \(f(x)-f(a)=(x-a)(2Aa+B+A(x-a))\).
Use \(|x-a|<\delta\) to replace the varying distance in the estimate by the proposed delta.
If the resulting bound is at most \(\varepsilon\), the strict output-error estimate gives the required error less than \(\varepsilon\).
This reasoning establishes a sufficient check: when the proposed delta makes the displayed upper bound at most \(\varepsilon\), the implication is proved. If a particular estimate does not establish that comparison, it has not verified the delta by this route. Do not silently replace an unsuccessful estimate with a claim that the delta works; any such claim needs its own justification.
A Common Strict-Inequality Mistake
A common mistake is to reject a proposed delta whenever the computed upper bound equals \(\varepsilon\). For \(f(x)=x^2\) at \(a=0\), with \(\delta=\frac12\) and \(\varepsilon=\frac14\), the mistaken calculation is: “The bound is \(\frac14\), and \(\frac14\) is not less than \(\frac14\), so the delta fails.” That compares the bound with \(\varepsilon\) but overlooks the strict inequality that precedes it.
The correction is that the estimate gives output error strictly less than the calculated bound. A bound equal to \(\varepsilon\) is therefore enough. A separate mistake is to use the nonconstant-quadratic strict estimate when \(A=B=0\); in that constant case, verify \(0<\varepsilon\) directly.
Check Your Understanding
For each question, identify the proposed limit as the function value at the given point, then use the relevant error estimate.
- For \(f(x)=4x+1\) at \(a=2\), does \(\delta=0.05\) guarantee an error below \(\varepsilon=0.2\)? Show the comparison.
- For \(f(x)=-2x+3\), what output-error estimate follows from \(|x-a|<\delta\)?
- For \(f(x)=x^2+2x\) at \(a=1\), calculate \(|2Aa+B|+|A|\delta\) when \(\delta=0.1\).
- Why can a proposed delta pass the test when the calculated bound equals \(\varepsilon\)?
- For \(f(x)=7\), why should the constant case be checked directly rather than by the strict nonconstant-quadratic estimate?